collapse

* User Info

 
 
Welcome, Guest. Please login or register.

* Bookmark/Share us

| More

* Support us

Is the ASW15 portal useful to you?
Consider a (small) donation to keep the project running:


Thanks to our sponsors:
christian larsen
Michelmusch
You!?

* Recent Posts

Another new member by Giancarlo
[03 October 2017, 00:33]


Rudder cables by Adam Howell
[28 August 2017, 13:28]


Wanted Fuselage aileron and air brake hook up hatch by Chuck Lohre
[15 August 2017, 14:51]


Detailed Engineering Drawings for ASW 15 or 15B by PConway31
[01 August 2017, 07:06]


New member by Bernard
[26 July 2017, 20:39]

* Gallery

OO-ZMB

Views: 932
Posted by: Pieter Hendrickx
in: ASW-15A OO-ZMB
OO-ZMB Cockpit

Views: 1520
Posted by: Pieter Hendrickx
in: ASW-15A OO-ZMB

Advertisement


Author Topic: Technical note n°23  (Read 688 times)

Offline Didier

  • Silver Member
  • **
  • Posts: 7
  • Registration number: OO-ZDO
  • Call sign: E7
  • Stationned at airfield: BELGIUM
Technical note n°23
« on: 14 June 2017, 11:18 »
Hello there,

How do you manage with technical note n°23 and who is allowed to perform the spar inspection ?

https://www.alexander-schleicher.de/wp-content/uploads/2015/03/150_TM23_E_HB.pdf

It seems that it has to be done yearly !

Any idea of the fees for that ?

Thks

Offline Didier

  • Silver Member
  • **
  • Posts: 7
  • Registration number: OO-ZDO
  • Call sign: E7
  • Stationned at airfield: BELGIUM
Re: Technical note n°23
« Reply #1 on: 20 June 2017, 11:12 »

Hello,

At the base, I understood that it was a unique operation until application of a fungicide. Based on TM 23 and TM 23-1.

However, the note on page 22a of the flight manual (TM23_E_HB) indicates that an annual survey of the spar is required.

I do not find any information saying that it is no longer necessary to do an annual inspection if the fungicide is applied.

If anyone could enlighten me on this subject ??

Are there any other owners of asw 15 on this forum ??

Thank you

Didier

Offline Rick Barber

  • Gold Member
  • ***
  • Posts: 38
  • I post to OLC with Hole In The Wall
  • Registration number: N15BT
  • Call sign: GWZ
  • Stationned at airfield: Warner Spings USA
Re: Technical note n°23
« Reply #2 on: 20 June 2017, 17:42 »
Hi Didier,

Visual inspection of the spar is part of each annual after the fungicide has been applied.

Rick

Offline Didier

  • Silver Member
  • **
  • Posts: 7
  • Registration number: OO-ZDO
  • Call sign: E7
  • Stationned at airfield: BELGIUM
Re: Technical note n°23
« Reply #3 on: 22 June 2017, 09:46 »
Thanks Rick